Installation Process
ICPI Installation Steps/Guide
Every project is different regarding installation, but the general process can be outlined as:
Demo and Excavate up to 5″- 9″, depending of installation site, of the existing surface. Remove all debris and haul it away to a qualified recycling center.
Compact Native Soil to ensure a firm base.
Installation of Geo-Textile Fabric Barrier.
Install up to 2”- 3” of Class II Road Base for Pedestrian areas or 3”- 6” for vehicular areas
Check and address all drainage and slope to 1% to 2% – water must move away from structures toward drains, if applicable, or toward street. Compact Base up to 95% compaction ratio.
Install up to 1” of sand bedding for pavers.
Install desired Pavers to chosen paver layout – 60mm residential pavers and 80mm commercial-grade pavers only for certain applications.
Install regular-shaped angled joint sand depending on the paver and project. Polymeric sand is optional and used in certain applications
Use a plate compactor to compact the sand down into the paver joints
Hose off, wash down, and clean pavers
Depending on contract/project, apply Color Enhancing Paver Sealer (optional)